Data Centers
Near Me
Explore map
Map
· TX
Proposed
Operator: CloudHQ
CloudHQ SAT Campus
San Antonio, Bexar County, TX
342 MW — enough power for ≈ 256,500 homes
Facility details
Status
Proposed
Power capacity
342 MW
Building size
3,023,300 sq ft
Cooling
Hybrid
Water source
Hybrid air/water
Power source
Grid (unspecified mix)
Address
15255 Lambda Drive
Sources
1.
bizjournals.com
— bizjournals.com
2.
centexdatacenters.org
— centexdatacenters.org
All data is compiled from public records and cited sources.
Report an error →
Facilities nearby
Operating
Microsoft
—
0.3 mi away
Operating
Microsoft Data Center: SAT46
—
San Antonio, TX
0.3 mi away
Operating
Microsoft Texas Research Park Campus
—
0.4 mi away
Operating
Microsoft TRP1
—
0.4 mi away
Operating
Vantage TX11
—
San Antonio, TX
0.5 mi away
Operating
Microsoft TRP2
—
0.5 mi away