Operating
Under constructionOperator: CoreSite
CoreSite DE3 Data Center
Elyria-Swansea (Denver), Denver County, CO
75 MW — enough power for ≈ 56,250 homes
Facility details
- Status
- Under construction
- Power capacity
- 75 MW
- Building size
- 180,000 sq ft
- Address
- 4900 Race St
- Expected online
- January 2026
Sources
- 1.denver7.com — denver7.com
- 2.cpr.org — cpr.org
- 3.coresite.com — coresite.com
- 4.coloradopolitics.com — coloradopolitics.com
- 5.ges-coalition.org — ges-coalition.org
All data is compiled from public records and cited sources. Report an error →