Operating
OperatingOperator: Stack
Stack Infrastructure POR03A Flagship Campus
Hillsboro, Washington County, OR
25 MW — enough power for ≈ 18,750 homes
Facility details
- Status
- Operating
- Power capacity
- 25 MW
- Address
- 25300 NE Evergreen Rd
- Expected online
- January 2027
Sources
- 1.datacenterdynamics.com — datacenterdynamics.com
- 2.stackinfra.com — stackinfra.com
All data is compiled from public records and cited sources. Report an error →