Proposed
ProposedOperator: Viridien
Viridien Data Center
Brenham, Washington County, TX
45 MW — enough power for ≈ 33,750 homes
Facility details
- Status
- Proposed
- Power capacity
- 45 MW
- Building size
- 40,000 sq ft
- Site area
- 21 acres
- Cooling
- Water
- Water source
- Water
- Power source
- Grid (unspecified mix), Solar
- Address
- 2602 Longwood Drive
Sources
- 1.datacenterdynamics.com — datacenterdynamics.com
- 2.change.org — change.org
All data is compiled from public records and cited sources. Report an error →