Data centers in Nevada
Existing and planned data centers across Nevada, mapped from the public record with capacity, operators, and impact scores.
32
total
12
planned
19
operating
0
contested
Combined capacity 6,619 MW — roughly the power of 4,964,250 homes.
All facilities
| Facility | Status | Operator | Capacity | Impact |
|---|---|---|---|---|
| Tract Data Center Silver Springs | Under construction | Fleet | 1,200 MW | 49 |
| Peru Ridge/ Peru Shelf Data Centers Sparks | Proposed | Tract/ Fleet | 1,405 MW | 49 |
| Tract Data Center Silver Springs | Proposed | — | 1,600 MW | 47 |
| South Valley Technology Park Data Center Sparks | Proposed | Tract | 1,200 MW | 46 |
| Google Henderson NV Data Center Henderson | Operating | 125 MW | 45 | |
| Switch Las Vegas CORE campus Las Vegas | Operating | Switch | 495 MW | 40 |
| Lumen Technologies mini Data Center Reno | Operating | — | 2 MW | 25 |
| Novva Data Center Las Vegas | Operating | — | 100 MW | 24 |
| Centra Reno | Under construction | — | 12 MW | 24 |
| Google Henderson | Operating | — | — | |
| Webb Data Center Reno | Under construction | — | 28 MW | 20 |
| Switch Las Vegas 4 Las Vegas | Operating | Switch | — | — |
| Switch Las Vegas 5 Las Vegas | Operating | Switch | — | — |
| DataBank Las Vegas LAS1 Las Vegas | Operating | DataBank | — | — |
| Flexential Las Vegas - Downtown Las Vegas | Operating | Flexential | — | — |
| Fiberhub LAS1 Las Vegas | Operating | Fiberhub | — | — |
| Switch Las Vegas 7 Enterprise | Operating | Switch | — | — |
| Flexential Las Vegas - North North Las Vegas | Operating | Flexential | — | — |
| Google Henderson | Operating | — | — | |
| NV11–NV14 Data Center Campus Sparks | Proposed | — | 224 MW | 19 |
| Oppidan Data Center Reno | Under construction | — | 8 MW | 19 |
| Switch Data Center Las Vegas | Proposed | Switch | — | — |
| Switch Data Center Las Vegas | Proposed | — | — | — |
| Apple Data Center Sparks | Operating | — | — | — |
| Jet.AI Moapa | Proposed | — | 50 MW | 12 |
| Tahoe Reno 1 McCarran | Operating | Switch | — | — |
| Tahoe Reno 4 McCarran | Operating | Switch | — | — |
| Tahoe Reno 5 McCarran | Operating | Switch | — | — |
| Townsite Solar 2 LLC (same as Clearway project that is now canceled?) Boulder City | Blocked | Townsite Solar 2 LLC | 170 MW | 11 |
| Tahoe Reno 2 McCarran | Operating | Switch | — | — |
| Tahoe Reno 3 McCarran | Operating | Switch | — | — |
| Novva Data Center (site 2) Las Vegas | Proposed | — | — | — |
Frequently asked questions
- How many data centers are in Nevada?
- We track 32 data centers in Nevada from public records — 19 operating and 12 planned or under construction.
- How much power do data centers in Nevada use?
- Their combined disclosed capacity is about 6,619 MW.
- Where does this data come from?
- Every facility is compiled from public records and cited sources, including the FracTracker Alliance U.S. Data Centers Tracker and OpenStreetMap (© OpenStreetMap contributors, licensed ODbL). You can report an error on any facility page.
Counties in Nevada
All data is compiled from public records and cited sources. Report an error →