Data centers in Texas
Existing and planned data centers across Texas, mapped from the public record with capacity, operators, and impact scores.
255
total
133
planned
115
operating
0
contested
Combined capacity 63,718 MW — roughly the power of 47,788,463 homes.
All facilities
| Facility | Status | Operator | Capacity | Impact |
|---|---|---|---|---|
| CloudBurst Data Center New Braunfels | Under construction | CloudBurst | 1,200 MW | 70 |
| Fermi America HyperGrid/ Project Matador Amarillo | Under construction | Fermi America and Texas Tech | 14,000 MW | 69 |
| Meta Project Seafox El Paso | Proposed | Wurldwide LLC/ Meta/ Blackrock | 1,000 MW | 66 |
| Childress Data Center Childress | Operating | IREN | 750 MW | 60 |
| IREN Sweetwater Hub Sweetwater | Under construction | IREN | 2,000 MW | 59 |
| Lacy Lakeview Data Center Lacy Lakeview | Under construction | InfraKey Capital | 1,000 MW | 59 |
| Open AI/ SoftBank Stargate Data Center (Lancium Clean Campus) Abilene | Operating | Microsoft (previously Open AI/Oracle) | 1,200 MW | 55 |
| Project LufKin: Amp Z Data Center Lufkin | Proposed | — | 1,138 MW | 51 |
| AREP PowerHouse Grand Prairie Midlothian | Under construction | PowerHouse Data Centers | 1,800 MW | 51 |
| Crusoe/ Blue Energy Data Center Victoria | Proposed | Crusoe | 1,500 MW | 51 |
| Goodnight Campus/Project Llano Claude | Operating | Crusoe | 1,030 MW | 50 |
| Frontier Vantage Data Center Abilene | Under construction | — | 1,400 MW | 49 |
| GW Ranch Project Pecos County | Under construction | Pacifico Energy | 1,000 MW | 49 |
| Eneus Energy Harlingen | Proposed | — | 2,000 MW | 49 |
| Project Freebird Burlington | Under construction | SB Energy | 1,200 MW | 49 |
| Hut 8 Beacon Point Data Center Corpus Christi | Operating | Hut 8 | 597 MW | 48 |
| Kahla Project Marquez | Proposed | Belltown Power | 1,500 MW | 48 |
| Project Comal Taylor | Under construction | KDC Real Estate | 360 MW | 48 |
| PowerBridge/LandBridge Between Odessa and Pecos | Proposed | — | 2,000 MW | 47 |
| MSB Global Services Matrix Data Center Sulphur Springs | Proposed | MSB Global Services | 3,000 MW | 47 |
| Project Aquilla: Abbott Holding Data Center Hill County | Proposed | RCM Hill | 1,235 MW | 47 |
| Project Horizon Fort Stockton | Proposed | Poolside/CoreWeave | 2,000 MW | 46 |
| Beacon Point Data Center Robstown | Proposed | Hut 8 | 352 MW | 45 |
| Temple Meta Data Center Temple | Operating | Meta | 152 MW | 45 |
| Tract Data Centers Lockhart | Proposed | — | 980 MW | 45 |
| Helios Data Center Afton | Operating | Galaxy Digital | 800 MW | 42 |
| Skybox Hutto PowerCampus Data Center Hutto | Under construction | — | 600 MW | 41 |
| Palomino Alpha Data Center Zorn | Proposed | PALOMINO ALPHA, LLC | 360 MW | 41 |
| CloudHQ SAT Campus San Antonio | Proposed | CloudHQ | 342 MW | 39 |
| Riot Platforms Rockdale Data Center Campus Rockdale | Operating | Riot Platforms | 700 MW | 38 |
| Riot Platforms Corsicana | Operating | — | 700 MW | 38 |
| Blueprint Projects Taylor | Under construction | BPP Projects LLC | 30 MW | 36 |
| Viridien Data Center Brenham | Proposed | Viridien | 45 MW | 35 |
| Project Aggie College Station | Cancelled | Priority Power Management | 600 MW | 35 |
| Comanche Circle Data Centers Tolar | Under construction | Sailfish Digital Ventures | 600 MW | 33 |
| Red Oak Data Center Campus Red Oak | Under construction | — | 350 MW | 33 |
| Project Caprock Data Center Abernathy | Under construction | Aligned | 540 MW | 33 |
| Aligned DFW Plano Data Center Campus Plano | Operating | Aligned Data Centers | 46 MW | 32 |
| CleanArc/ Crow Holdings Data Center Dallas | Proposed | — | 245 MW | 31 |
| Texas Critical Data Centers Ector County | Proposed | — | 625 MW | 31 |
| Digital Bridge Data Center Lancaster | Proposed | — | 550 MW | 31 |
| Skybox PowerCampus Dallas Lancaster | Operating | — | 300 MW | 31 |
| Cipher Data Center Riesel | Proposed | Cipher | 500 MW | 31 |
| CyrusOne: DFW10 Whitney | Under construction | CyrusOne, Calpine | 400 MW | 30 |
| APR Energy Data Center Pampa | Under construction | APR Energy | 400 MW | 30 |
| Nexus Data Center: Apex DFW HB1 and HB2 Hubbard | Proposed | — | 600 MW | 30 |
| Legacy Data Center Marion | Proposed | — | 50 MW | 29 |
| Denton Data Center Denton | Operating | — | 391 MW | 29 |
| Fluidstack Colorado City | Operating | — | 300 MW | 29 |
| Bitdeer AI Rockdale | Proposed | Bitdeer | 563 MW | 29 |
| Powerhouse Data Center Irving | Proposed | — | 201 MW | 29 |
| Powerhouse Data Center Keller | Proposed | — | 300 MW | 28 |
| QTS-Irving Irving | Operating | — | 147 MW | 28 |
| Project Mockingbird Mustang Ridge | Proposed | Cielo Digital Infrastructure | 500 MW | 28 |
| Stemmons Corridor data campus Dallas | Proposed | CleanArc | 158 MW | 27 |
| CleanSpark Data Center Brazoria County | Proposed | CleanSpark | 450 MW | 27 |
| Edged (DFW01-1) Data Center Irving | Operating | Edged | 24 MW | 26 |
| DataBank Dallas Empire Central Data Center Dallas | Operating | DataBank | — | — |
| Equinix Data Center Dallas | Operating | — | — | — |
| Cologix Dallas Data Centers Dallas | Operating | — | — | — |
| Flexential Dallas - Downtown Dallas Dallas | Operating | Flexential | — | — |
| Rad Web Hosting Dallas | Operating | — | — | — |
| Equinix Infomart Dallas | Operating | Equinix | — | — |
| DataBank Dallas | Operating | — | — | — |
| CoreSpace Dallas Dallas | Operating | CoreSpace | — | — |
| Alpheus DataCenter Austin | Operating | Alpheus | — | — |
| Live Oak Data Center Dallas | Operating | — | — | — |
| Dallas Data Center Dallas | Operating | — | 12 MW | 25 |
| Prime DFW01-01 Dallas | Operating | Prime | — | — |
| Lumen Dallas - 3180 Irving Blvd. Dallas | Operating | Lumen Technologies | — | — |
| TierPoint - Dallas Data Center Dallas | Operating | — | — | — |
| Prime DFW01-01 Dallas | Operating | Prime | — | — |
| Databank Red Oak Campus Red Oak | Operating | DataBank | 240 MW | 24 |
| Centersquare Dallas/Fort Worth Data Center Fort Worth | Operating | — | — | — |
| CyrusOne Fairfield Fairfield | Under construction | CyrusOne | 380 MW | 24 |
| VIRTBIZ Dallas | Operating | — | — | — |
| Digital Realty Austin AUS11 Austin | Operating | — | — | — |
| Alinged Data Center DFW-03 Mansfield | Operating | Aligned Data Centers, LLC | — | — |
| Skybox Atlantic Station Plano | Operating | — | 100 MW | 24 |
| Serverfarm Data Center (CTX 1, CTX 2) Houston | Operating | — | 70 MW | 23 |
| Rowan AUS01 Temple | Under construction | Rowan | 300 MW | 23 |
| Data Foundry 01 Austin | Operating | Data Foundry | 24 MW | 23 |
| LightEdge Austin II Austin | Operating | — | — | — |
| Core Scientific Hunt County Data Center Quinlan | Under construction | Core Scientific | 285 MW | 23 |
| Digital Realty Data Center Lewisville | Operating | — | — | — |
| Centersquare Dallas/Fort Worth Data Center Dallas | Operating | — | — | — |
| MDC El Paso | Operating | — | — | — |
| Data Foundry - Texas 1 Austin | Operating | — | — | — |
| Core Scientific Pecos | Operating | Core Scientific | 300 MW | 22 |
| Data Foundry - Texas 2 Austin | Operating | — | — | — |
| Pyote Data Center Pyote | Operating | — | 300 MW | 22 |
| CyrusOne/Eolian Data Center Fort Worth | Under construction | CyrusOne/Eolian | 70 MW | 22 |
| Houston One Data Center Katy | Operating | Element Critical | 26 MW | 21 |
| CyrusOne: SAT2-SAT3 San Antonio | Operating | CyrusOne | 36 MW | 21 |
| CoreWeave Plano Plano | Operating | — | 30 MW | 21 |
| Skybox Round Rock Data Center Round Rock | Under construction | Skybox Datacenters | 40 MW | 21 |
| Richardson Data Center Richardson | Operating | — | 24 MW | 21 |
| North East Data Center LLC Lytle | Proposed | Rowan | 300 MW | 21 |
| Centersquare Allen DFW2 Data Center Allen | Operating | Centersquare | 14 MW | 21 |
| Sugar Land Data Center Sugar Land | Operating | — | — | — |
| Black Pearl Data Center Wink | Under construction | Cipher/Amazon | 300 MW | 21 |
| Evoque Allen DA1 Allen | Operating | Centersquare | — | — |
| Equinix DA7 Data Center Plano | Operating | — | — | — |
| Equinix: DA12-1 and DA12-2 Dallas | Proposed | Equinix | — | — |
| QTS San Antonio San Antonio | Operating | — | — | — |
| Flexential Dallas - Richardson Data Center Dallas | Operating | — | 4 MW | 20 |
| Digital Realty Dallas DFW18 Richardson | Proposed | — | 100 MW | 20 |
| Digital Realty Dallas DFW28 Richardson | Operating | — | 7 MW | 20 |
| AIG Amarillo Data Center Amarillo | Operating | — | — | — |
| Sabey Data Center Round Rock | Operating | — | — | — |
| Oppidan Data Center Socorro | Proposed | Oppidan | 5 MW | 20 |
| Stream Data Centers DFWA Garland | Operating | Stream Data Centers | — | — |
| Stream Data Centers Houston The Woodlands | Operating | — | — | — |
| Aligned DFW-01 Plano | Operating | Aligned | — | — |
| Thin-nology Pflugerville | Operating | — | — | — |
| Stream DFW IV Richardson | Operating | Stream | — | — |
| Rackspace Richardson DFW3 Richardson | Operating | Rackspace | — | — |
| Digital Realty Dallas DFW17 Richardson | Operating | Digital Realty | — | — |
| Digital Realty Dallas DFW29 Richardson | Operating | Digital Realty | — | — |
| Digital Realty Dallas DFW35 Richardson | Operating | Digital Realty | — | — |
| Flexential Dallas - Plano Plano | Operating | Flexential | — | — |
| Rice Data Center Houston | Operating | — | — | — |
| DataBank Plano Data Center Plano | Operating | DataBank | — | — |
| Compass Data Center Red Oak | Operating | — | — | — |
| Giga Texas Datacenter Austin | Operating | — | — | — |
| Evocative DAL6 Plano | Operating | — | 12 MW | 20 |
| Project Rosa near Santa Rosa | Under construction | — | 187 MW | 20 |
| Stream Data Center San Antonio | Operating | — | — | — |
| Aligned Data Centers DFW-04 Plano | Operating | Aligned Data Centers | — | — |
| Aligned DFW-02 Plano | Operating | Aligned | — | — |
| Vantage Data Centers TX21 San Antonio | Operating | Vantage Data Centers | — | — |
| Chase Tower McAllen Data Center McAllen | Operating | — | 4 MW | 20 |
| Red Oak Google Data Center Red Oak | Operating | — | — | |
| Chevron Data Center San Antonio | Operating | — | — | — |
| Microsoft Data Center: SAT46 San Antonio | Operating | Microsoft | — | — |
| Microsoft San Antonio Data Center San Antonio | Operating | Microsoft | — | — |
| 365 Data Centers - Richardson Richardson | Operating | — | 6 MW | 20 |
| NTT Global Data Centers Americas - Dallas TX1 Garland | Operating | — | — | — |
| DataBank Legacy Park Plano Data Center Plano | Operating | — | — | — |
| Citicorp Data Systems San Antonio | Operating | — | — | — |
| Lowes San Antonio Data Center San Antonio | Operating | — | — | — |
| H5 Data Center San Antonio | Operating | — | — | — |
| CyrusOne: SAT1 San Antonio | Operating | CyrusOne | 9 MW | 20 |
| CyrusOne: SAT4 San Antonio | Operating | CyrusOne | — | — |
| Meta Forth Worth Data Center Fort Worth | Operating | Meta | — | — |
| Texarkana Data center Texarkana | Operating | — | — | — |
| Experian Allen Data Center Allen | Operating | — | — | — |
| Oracle Austin Data Center Austin | Operating | Oracle | — | — |
| QTS- Fort Worth-Dallas Fort Worth | Operating | — | — | — |
| Georgetown Data Center Georgetown | Operating | — | — | — |
| CyrusOne LLC - Houston West III Data Center Houston | Operating | CyrusOne | — | — |
| Experian McKinney Data Center McKinney | Operating | — | — | — |
| Skybox Austin Data Center Campus Pflugerville | Under construction | Skybox Datacenters | 30 MW | 20 |
| DFW-04 Data Center Plano | Operating | — | — | — |
| Digital Realty Dallas DFW16 Richardson | Operating | — | 7 MW | 20 |
| Cornerstone Southwest Data Center Roanoke | Operating | — | — | — |
| Red Oak Data Center 2 Red Oak | Operating | — | — | |
| Blueprint Project Georgetown | Under construction | Blueprint Project | 35 MW | 20 |
| CyrusOne: SAT5-SAT6 San Antonio | Operating | CyrusOne | 18 MW | 20 |
| Rowdy Data Center Vernon | Operating | — | 230 MW | 19 |
| Project Oranger Lancaster | Proposed | — | 252 MW | 19 |
| Google Abernathy Data Center Abernathy | Proposed | Fluidstack/TeraWulf/Google | 204 MW | 19 |
| TX12: Vantage Data Center San Antonio | Proposed | — | 96 MW | 19 |
| Vantage TX12 San Antonio | Operating | Vantage Data Centers | — | — |
| NSA Texas Cryptology Center San Antonio | Under construction | NSA/CSS | — | — |
| AWS Rockfish 3 San Antonio | Under construction | — | — | — |
| AWS Rockfish 2 San Antonio | Under construction | — | — | — |
| Project Big Pine New Boston | Proposed | — | 300 MW | 19 |
| Vantage TX12 San Antonio | Operating | Vantage Data Centers | — | — |
| Jarrell Data Center Jarrell | Proposed | Mesones | 200 MW | 18 |
| CleanSpark Sealy Data Center Austin County | Proposed | CleanSpark | 285 MW | 18 |
| Vantage TX11 San Antonio | Operating | Vantage Data Centers | — | — |
| Qumulus AI Denton | Proposed | Qumulus AI | 20 MW | 17 |
| Edged Fort Worth Data Center Fort Worth | Proposed | Edged | — | — |
| Project Raptor Hutto | Proposed | Colovore | — | — |
| Microsoft SAT 81 San Antonio | Operating | Microsoft | — | — |
| Microsoft SAT 80 San Antonio | Operating | Microsoft | — | — |
| TX11: Vantage Data Center San Antonio | Proposed | — | 32 MW | 16 |
| Amazon San Antonio Data Center San Antonio | Proposed | COPT | — | — |
| Microsoft Data Center: SAT15 San Antonio | Proposed | Microsoft | — | — |
| Microsoft Data Center San Antonio | Proposed | Microsoft | — | — |
| Microsoft Data Center: SAT14 San Antonio | Proposed | Microsoft | — | — |
| TX21: Vantage Data Center San Antonio | Proposed | — | — | — |
| TX22: Vantage Data Center San Antonio | Proposed | — | — | — |
| Athlon Blockchain Technology El Reno | Operating | Athlon Blockchain Technology | — | — |
| EdgeConneX AUS02 Cedar Creek | Proposed | EdgeConneX | 240 MW | 16 |
| SAT 93 and SAT94 Medina/ Castroville | Proposed | Microsoft | — | — |
| BaRupOn Data Center Liberty | Proposed | — | 240 MW | 16 |
| Project Kati 1 and 2 Santa Monica | Under construction | — | 166 MW | 16 |
| Microsoft SAT 82 San Antonio | Operating | Microsoft | — | — |
| Fort Bliss Data Center Fort Bliss | Proposed | — | — | — |
| Black Mountain Data Center Fort Worth | Proposed | — | — | — |
| Flexential Data Center Talty | Proposed | Flexential | 108 MW | 15 |
| Project Annie Paris | Under construction | — | 75 MW | 15 |
| Project Hutto Hutto | Cancelled | — | 70 MW | 14 |
| Edged Energy Outpost Data Center Fort Worth | Proposed | Edged | — | — |
| MARA Bitcoin Mining Data Center Granbury | Operating | Marathon Digital Holdings (MARA) | — | 14 |
| Project Hedy near Lyford | Under construction | — | 120 MW | 14 |
| Texas Solarworks LLC Lubbock | Proposed | — | — | — |
| AWS Rockfish 1 San Antonio | Under construction | — | — | — |
| Willis Data Center Willis | Proposed | — | — | — |
| Fort Hood Data Center Coryell | Proposed | — | — | — |
| QTS Wilmer (DFW2 and DC1) Lancaster | Operating | — | — | — |
| Project Ellen near Rio Hondo | Under construction | — | 100 MW | 13 |
| Project Fei near Childress | Under construction | — | 100 MW | 13 |
| EdgeConneX AUS01 Cedar Creek | Under construction | EdgeConneX | 96 MW | 13 |
| Google Project Sharka Midlothian | Under construction | — | — | — |
| Black Mountain Power Data Center Van Ormy/ San Antonio | Proposed | Black Mountain Power | — | — |
| Diode Ventures Data Center Trinidad | Cancelled | Diode Ventures | 150 MW | 12 |
| Brownsville Data Center Brownsville | Cancelled | — | — | — |
| BT Gateway Data Center Royse City | Proposed | — | — | — |
| Project Labrador Lancaster | Proposed | — | — | — |
| Project Dorothy 1A and 1B Silverton | Operating | — | 50 MW | 12 |
| Onmine Data Center Killen | Blocked | — | — | — |
| Project Gladys (Soluna) Bishop | Proposed | — | 150 MW | 12 |
| Vulcan Core LLC Bitcoin Tyler | Cancelled | Vulcan Core LLC | 12 MW | 11 |
| Project Dorothy 2 Silverton | Under construction | — | 48 MW | 11 |
| Amazon/ Floydada Data Center Floydada | Proposed | Amazon | — | — |
| Galaxy Digital Data Center McGregor | Proposed | Galaxy Digital | 75 MW | 11 |
| AWS Project Eagle Boling | Proposed | Amazon | 75 MW | 10 |
| SAT 80-82 Data Center Campus San Antonio | Proposed | Microsoft | — | — |
| Microsoft Castroville Data Center Castroville | Proposed | Microsoft | — | — |
| Lone Star Project Glasscock County | Proposed | Pace | 100 MW | 10 |
| Bitter Blue Data Center Elmendorf | Proposed | — | — | — |
| Matagorda County Data Centers Matagora County | Proposed | — | 20 MW | 10 |
| EdgeConneX AUS03-04 Cedar Creek | Operating | EdgeConneX | — | — |
| Venus Data Center Venus | Proposed | — | — | — |
| Rowan AUS02 Temple | Proposed | Rowan | — | — |
| CyrusOne Castroville Castroville | Proposed | CyrusOne | — | — |
| Project Saltworks Graham | Proposed | Stream | — | — |
| Midlothian 1 Data Center Venus | Proposed | — | — | — |
| Midlothian 2 Data Center Venus | Proposed | — | — | — |
| Cawley Partners Ferris | Proposed | — | — | — |
| HyperDataGrid Data Center Lufkin | Proposed | — | 20 MW | 9 |
| Edged Austin Maxwell | Proposed | Edged | — | — |
| Prime DC AUS01 and AUS02 Maxwell | Proposed | Prime DC | — | — |
| Midlothian 5 Data Center Venus | Proposed | — | — | — |
| Midlothian 3 Data Center Venus | Proposed | — | — | — |
| Iron Mountain Data Center Hutto | Proposed | — | — | — |
| Midlothian 6 Data Center Venus | Proposed | — | — | — |
| Midlothian 4 Data Center Venus | Proposed | — | — | — |
| Provident Data Center Hillsboro | Proposed | — | — | — |
| Amazon Data Center Fort Stockton | Proposed | Amazon | — | — |
| Emergent Data Center San Angelo | Proposed | Skybox Datacenters, Emergent | — | — |
| PowerHouse Data Centers Uhland | Proposed | — | — | — |
| TeraFab Chip Manufacturing Facility (not data center) Anderson | Proposed | Spacex | — | — |
| Project Pumpkin 2A Miami | Proposed | — | — | |
| Project Rise 1A and Project Rise 2A Oklaunion | Proposed | — | — | — |
| Lancium Childress Childress | Proposed | — | — | — |
| Project Merlin McGregor | Proposed | — | — | — |
| Data Center THM1A Lueders | Proposed | — | — | — |
| Journey 1A and 2A Data Centers Haskell | Proposed | — | — | |
| FO Permian Partners and HiVolt Energy Data Center Midland County | Proposed | — | — | — |
| Milam County Data Center Milam County | Proposed | — | — | |
| San Marcos Data Center San Marcos | Cancelled | Highlander SM One LLC | — | — |
Frequently asked questions
- How many data centers are in Texas?
- We track 255 data centers in Texas from public records — 115 operating and 133 planned or under construction.
- How much power do data centers in Texas use?
- Their combined disclosed capacity is about 63,718 MW.
- Where does this data come from?
- Every facility is compiled from public records and cited sources, including the FracTracker Alliance U.S. Data Centers Tracker and OpenStreetMap (© OpenStreetMap contributors, licensed ODbL). You can report an error on any facility page.
Counties in Texas
- Angelina County
- Armstrong County
- Austin County
- Bastrop County
- Bell County
- Bexar County
- Bexar County; Atascosa County
- Bosque County
- Bowie County
- Brazos County
- Briscoe County
- Caldwell County
- Cameron County
- Carson County
- Childress County
- Collin County
- Dallas County
- Denton County
- Dickens County
- Ector County
- El Paso County
- Ellis County
- Fisher County
- Floyd County
- Fort Bend County
- Freestone County
- Glasscock County
- Gray County
- Grimes County
- Guadalupe County
- Guadelupe County
- Hale County
- Harris County
- Haskell County
- Hays; Guadalupe; Comal; Caldwell County
- Henderson County
- Hidalgo County
- Hill County
- Hood County
- Hopkins County
- Hunt County
- Johnson County
- Jones County
- Kaufman County
- Lamar County
- Leon County
- Liberty County
- Lubbock County
- Matagorda County
- McLennan County
- McLennan and Coryell County
- Medina County
- Midland County
- Milam County
- Mitchell County
- Montgomery County
- Navarro County
- Nueces County
- Pecos County
- Reeves County
- Roberts County
- Smith County
- Tarrant County
- Tom Green County
- Travis County
- Victoria County
- Ward County
- Washington County
- Wharton County
- Wilbarger County
- Willacy County
- Williamson County
- Winkler County
- Young County
All data is compiled from public records and cited sources. Report an error →